-
Put the guy rods in a chain with chain link connectors. Alternate the red and white guy
rods.
There are 3 white and 3 red guy rods for each guying.
-
Attach the guy rods to the guy rod flange on mast tube 3 with a shackle. Put a white
guy rod closest to the top of the mast.