Unpacking - DKE110F

DKE110F User Guide

Document code
M211788EN
Revision
F
Language
English
Product
DKE110F
Document type
User guide
  1. Check the contents against the packing list.
  2. Check the cartons and boxes for possible damage. Check that there are no loose parts or connectors before installing the mechanics of the equipment and cabling them. If there has been any damage, contact Vaisala without delay.
  3. Remove the parts and the packing material from the containers carefully. Save the containers and all the packing material for future transporting or shipping.
    CAUTION Unpack the mast carefully on the assembly site.
    CAUTION Handle the glass fiber structures with care.
  4. If you have ordered the optional DKE100TS Tilt Support, it is placed inside a mast tube. Remove it carefully from the tube and remove the packing material.