Required tools and materials - DKE110F

DKE110F User Guide

Document code
M211788EN
Revision
F
Language
English
Product
DKE110F
Document type
User guide

The following tools and materials are required but not supplied by Vaisala.

For new concrete foundations:

  • Bucket of water (1 to 2 pcs)
  • Cable conduit 525 mm (20.67 in), Ø 50 mm (1.97 in) R300 (2 pcs)
  • Cover such as tarpaulin
  • Hammer
  • Pen or marker
  • Saw
  • Shovel (1 to 2 pcs)
  • Spirit level
  • Stands for reinforcement structure
  • Steel reinforcement bar TW8 18.8 m (61.6 ft) / 7.4 kg (16.4 lb) to make:

    • Reinforcement TW8 C‑shape, base rod length 1000 mm (39.37 in) Ø 8 mm (12 pcs)
    • Reinforcement TW8 straight, base rod length 850 mm (33.46 in) Ø 8 mm (8 pcs)
  • Steel reinforcement bar TW10 17.4 m (57.0 ft) / 10.7 kg (23.6 lb) to make:

    • Lift part TW10, base rod length 1050 mm (41.34 in) Ø 10 mm (2 pcs)
    • Reinforcement TW10 straight, base rod length 850 mm (33.46 in) Ø 10 mm (18 pcs)
  • Steel wire
  • Tape
  • Wooden board for leveling, from 1.2 to 1.5 meters long (from 3 ft 11 in to 4 ft 11 in)
  • Wood for building the mold

For existing concrete foundations:

  • Adhesive tape
  • Brush and compressed air or air pump
  • Chemical anchor such as injectable adhesive anchor
  • Drill hammer
  • Hammer
  • Percussion drill
  • Spirit level

For planning and installation:

  • Set of wrenches
  • Set of Allen keys
  • Cable stripper
  • Cable ties
  • Compass
  • Crosshead and flat head screwdrivers
  • Hammer
  • Measuring tape
  • Spirit level
  • Torque wrench with adapters for hex bolts M12, M16, and M20
  • Wire cutters
  • Non-conductive, non-water-soluble, non-silicon-based grease, such as ceramic or Teflon paste
Wear protective eyewear, gloves, safety helmet, and safety shoes.