Unpacking DGA monitor - OPT100

OPT100 Installation Guide

Document code
M211857EN
Revision
V
Language
English
Product
OPT100
Document type
User guide
  • Wire cutters
Two persons are required to lift the DGA monitor out of the packaging.
  1. Cut the packing straps and remove the cover.
  2. Remove the top padding from the box.
  3. Lift the DGA monitor out of the box and set it down on a stable surface so that the door side is on top.
    CAUTION The cable glands and oil connections of the DGA monitor are located on the bottom of the cabinet. When unpacking and moving the DGA monitor, avoid putting the bottom of the DGA monitor on the ground. Putting the weight of the unit on the cable glands and oil connections may damage them. Keep the oil connections clean to ensure tight connections and to prevent dirt from getting into the oil circulation.