|
Before starting the initialization, make sure that:
- DGA monitor is fully installed and wired.
- All oil connections are completed.
- Necessary trace heating and thermal insulation is in place for devices using ester liquids.
- DGA monitor is turned on.
- You are connected to the user interface with a web browser.
CAUTION Do not perform initialization for devices using ester liquids in temperatures below -10 °C (+14 °F). |
You must have physical access to the DGA monitor cabinet and the oil valves on the transformer. Do not try to perform the initialization remotely. You can stop the initialization sequence at most phases by selecting . |
While waiting between the initialization steps, you can navigate away from the Control page and access the other pages (for example, to perform system configuration tasks). Remember to come back to the Control page to complete the initialization. |