Installing screw pile foundation - DKP110

DKP110 User Guide

Document code
M211625EN
Revision
H
Language
English
Product
DKP110
Document type
User guide
  • Adjustable wrenches
  • Crowbar
  • Measuring tape
WARNING In soft soil, when using screw pile foundation, do not install the mast when the ground is very moist (for example, during rain or after heavy rain).
In soft soils, you can install the mast using screw pile foundations. The length of screw piles for DKP110 is 1.5 m (4 ft 11 in).
  1. Check the possible locations of water and gas lines, sewers, telecommunication cables, and electric cables.
  2. Turn the screw pile into the ground manually, using a crowbar.

    The maximum tightening torque in turning is 900 Nm, depending on the soil properties.