In soft soil, you can install the screw pile foundations for the guy wires.
-
Check the possible locations of water and gas lines, sewers, telecommunication cables,
and electric cables.
-
Place the screw piles at a distance of 5 to 6 m (16 ft 5 in to 19 ft 8 in) according to
the length of the guy wires.
-
Assemble the screw piles. Tightening torque 250 Nm.