Installing grounding connector - DKP110

DKP110 User Guide

Document code
M211625EN
Revision
H
Language
English
Product
DKP110
Document type
User guide
  • Allen key
  • Adjustable wrench
WARNING Always consult local authorities on decisions that relate to aviation safety, grounding, lightning protection, safe installation, and power supply. Follow local and state legislation and regulations.
CAUTION The installation of the air terminal as instructed by Vaisala is based on international IEC standards. This means routing the down conductor along the side of the mast and connecting the lightning protection grounding and equipment grounding to a grounding connector at the base of the mast. If local and state legislation and regulations are different from the Vaisala installation instructions, it is the responsibility of the customer to make sure that that grounding and lightning protection comply with local and state legislation and regulations.

The grounding connector set includes 2 wood screws that are not needed in the installation.

  1. Remove the black plastic caps from the grounding connector.
  2. Attach the grounding connector on the base hinge with the screws and washers.
    31
    Grounding connector Cu
    32
    Hex nut DIN934 M6 AISI316 (2 pcs)
    33
    Cylinder head cap screw DIN912 M6×30 AISI 316 (2 pcs)
    34
    Flat washer DIN125 A6,4 AISI 316 (2 pcs)