To insert the thermistor into the hole in the pump base of the ozone sensor, push the
thermistor hose into the hole.
SPC ECC-6A with thermistor
assembled
In the (SPC) sensor, the hole is below the air outlet of the pump.
In the (EN-SCI) sensor, the temperature measuring hole is on the opposite side of the pump (and is connected through the frame).