Plan the installation location carefully
before installation. See Choosing installation location.
| Before starting, locate the emergency
shower. |
These are instructions for mounting the
SDI5 Safe-Drive with the retrofit mounting kit. Use the retrofit mounting kit if you are
updating from PR-23-SD Safe-Drive to SDI5 Safe-Drive. The retrofit mounting kit is used for a
weld free installation using the old welding connection.Plan the process‑specific installation
according to your requirements. Contact Vaisala technical support for further assistance if
needed.
-
Familiarize yourself with the safety instructions of the installation site.
-
Make sure the process line is depressurized and empty.
-
Install the flange adapters into the welding connection.
-
Install the hand wheel.
-
Install the spacer and align the isolation valve and retractor with the welding
connection. Make sure the isolation valve is closed as shown in the figure. Two persons
are required for the installation. It is recommended that the valve handle is pointing
upward.
-
Cross-tighten the bolts to 27 Nm using a 16-mm wrench. Hold the equipment level while
tightening.
| CAUTION Be careful not to
over-tighten. Using the ball valve will become difficult if the connections are too
tight. |
-
Install protection caps over the nuts. This prevents incorrect usage when the
refractometer is retracted.
-
Make sure all connections are properly tightened.