|
Wear protective eyewear, gloves, and a safety helmet. |
Required personnel: a minimum of 2 persons |
If you are using guy wires, cast the foundations for them at the same time. |
Loosen the cast molds after 2 to 3 days and remove the cast mold after a week. To achieve compressive cube strength, wait for 28 days for the concrete to harden.