All civil works must be completed as instructed in this guide before starting instrument installation.
The customer is responsible for supplying the accessories, such as grounding cables and conduits for cables.
Item Reference Data Remarks
Instrument location
Site is free of obstacles that can disturb the equipment. Site requirements

☐ Yes

☐ No

Grounding
System grounding cable ready as instructed. Grounding

☐ Yes

☐ No

Grounding resistance tested. Recommended grounding resistance is <3 Ω. -

☐ Yes

☐ No

Measured resistance (Ω):

Cabling
Cable protection is installed. Power supply and communication lines

☐ Yes

☐ No

Data communication cable is ready and tested with a resistance meter. -

☐ Yes

☐ No

AC (mains) power supply -
AC (mains) power is available for the equipment. Power cabling

☐ Yes

☐ No

Measured (V AC, Hz):

Uninterrupted power supply (UPS) is available for site equipment. Power supply and communication lines

☐ Yes

☐ No

Measured (V AC, Hz):

Foundation
Foundation bolts are installed and the pattern is verified. Foundation design and foundation bolt pattern

☐ Yes

☐ No