Follow these instructions to install the
refractometer with a flow cell. Notice that the images in this instruction may differ from the
flow cell you have for your process.
Make sure the process line is depressurized.
Weld ferrules into the process pipeline according to material and system
requirements.
Flow cell installation dimension
Flow cells
1"
1 ½"
2"
2 ½"
3"
4"
A (mm [in])
52.5 [2.0]
72.2 [2.8]
91.0 [3.5]
110.2 [4.3]
128.3 [5.0]
169.6 [6.6]
Install gasket into the ferrule.
Install flow cell using clamps.
Finger tighten to 3 Nm if you are using the clamp with one tightening screw.
Tighten to 28 Nm with 9/16" wrench if you are using the sanitary clamp with two
tightening screws.
Install gasket for the refractometer.
Mount the refractometer. Make sure the cable glands on the refractometer are in a
downward position.
Finger tighten to 3 Nm if you are using the standard clamp (with one tightening
screw).
Tighten to 28 Nm with 9/16 inch wrench if you are using the high pressure clamp
(with two tightening screws).
Make sure the wash system connection on the flow cell is properly plugged to avoid
leakage.
Make sure the refractometer is firmly in place and that there is no excessive
vibration. Support the piping if needed.