Attach PSU501 to the pole mast with 2 brackets. When the mast diameter is over 63 mm (2.48 in), use steel bands for attaching.
The minimum installation height is 100 cm (40 in). |
If you have solar panel SOL501 included in your BWS500 station, install the panel on the pole mast at the same time with the power supply unit. Follow the instructions in Attaching solar panel to less than 63 mm (2.48 in) diameter pole mast. |
- Attach 2 pole mount brackets to PSU501 with 4 screws.
- Attach PSU501 to the pole mast with steel bands.
- Tighten the bands and screws to keep PSU501 firmly in place.