Site requirements - BWS500

BWS500 Setup Guide

Document code
M212787EN
Revision
C
Language
English
Product
BWS500
Document type
User guide

For the most reliable measurements, choose a site that represents the conditions that you wish to measure. Nearby buildings, trees, and heat sources can distort the measurements.

The installation site must be within the cellular network coverage area of your network operator.
For powering BWS500, the site must have at least one of the following:
  • Power supply lines for AC (mains) power
  • Sufficient amount of sunshine for solar panel and DC powering