5. Completing installation - GroundCast

Vaisala GroundCast Setup and Removal Guide

Document code
M212671EN
Revision
C
Language
English
Product
GroundCast
Document type
User guide
1. When the sealant is set, remove the holder, the extra sleeve, and the overflown sealant.

2. The device surface must be 1 ... 3 mm (0.04 ... 0.12 in) below the road surface.

If the device is on the road surface level or above the road surface, use the adjustment tool to lower the device.

The installation is ready.

The device sends data automatically to the cloud.