Finalizing installation - MGP261 - MGP262

MGP260 User Guide

Document code
M212504EN
Revision
C
Language
English
Product
MGP261
MGP262
Document type
User guide
1
Safety pin: in ball valve installations, lock the handle of the ball valve in the open position with the safety pin to prevent damage caused by closing the valve with the instrument inside.
2
Probe grounding terminal.
  1. Close the connection box and tighten the captive Allen screws on the connection box flange. Tighten the cable glands, and then tighten the probe to final tightness on the installation port by turning the tightening nut with a 50 mm (1.97 in) wrench.
  2. Connect the MGP260 grounding terminal to the grounding rail of the installation site with a ≥ 4 mm2 wire.
  3. Ball valve installations only: lock the handle of the ball valve in the open position with the safety pin.
  4. When done, switch on the power supply input.