  • Concrete quality must be better than K30. If the foundation is prefabricated, the foundation has to be prepared with lifting hooks.
  • Preferable conduit type:

    • Material: PVC
    • Minimum diameter: 50 mm (1.97 in)
    • All conduits sealed with plugs to prevent water entry
    • Pullstrings placed in all conduits
Center the reinforcement in the concrete foundation.
Figure 1. Concrete reinforcing for circular foundation for rain gauge
1
All bars are joined with steel thread, Ø 1.5 mm (0.16 in) (see detail A) or welded (see detail B)
2

Item 1: length 400 mm (15.75 in) (20 pcs)

Item 2: length 520 mm (20.47 in) (20 pcs)

Item 3: H (final length of the foundation) = H − (2 × 48 mm / 1.97 in)

3
Concrete reinforcing bar Ø 8 mm (0.35 in)