- Select the site.
- Plan the layout of the site.
- Arrange for the civil works with reference to the site layout plans, including concrete foundations for the mast and sensors, outdoor cabling, and overvoltage protection.
-
Collect all required information needed to configure the system. Make sure that you
have a USB‑C cable (delivered with AWS810) and a laptop with Windows operating system and
access to the Web UI.
For more information, see AWS810 Configuration and Maintenance Guide (M212419EN).
- Collect all tools required for the mechanical installation.