Attaching ball valve kit to process - HMT370EX

HMT370EX User Guide

Document code
M212305EN
Revision
B
Language
English (United States)
Product
HMT370EX
Document type
User guide
1
Ball valve handle: must point to the same direction as the ball valve body when installing.
2
Extension nipple, threads G1/2 ISO228/1 and R1/2 ISO7/1.
3
Ball valve body. When tightening the assembly, turn only from the ball valve body.
4
Ball of the ball valve.
5
Welding joint, threads R1/2 ISO7/1.
  1. Attach the welding joint to the process pipe or chamber.
  2. Apply a sealant (MEGA-PIPE EXTRA No. 7188 or LOCTITE® No. 542 with activator No. 7649) on the threads of the welding joint and screw the bottom of the ball valve onto the welding joint.
  3. Tighten the ball valve assembly by turning from the ball valve body.
    CAUTION Tightening the ball valve kit by turning the extension nipple can break the sealing. Tighten the ball valve assembly only from the ball valve body.
  4. If you need to cap the ball valve assembly before installing or after removing the probe, attach a blanking nut to close the top of the valve.