Installing foundation bolts - DKE110AV - DKE110W

DKE110W and DKE110AV User Guide

Document code
M211943EN
Revision
E
Language
English
Product
DKE110AV
DKE110W
Document type
User guide
  • Adhesive tape
  • Brush and compressed air or air pump
  • Chemical anchor such as injectable adhesive anchor
  • Drill hammer
  • Hammer
  • Measuring tape
  • Spirit level

To install the bolts, use the foundation bolts (6 pcs) for the mast and guy wire foundations.

  1. Check that the mast foundation bolts are at the correct height, vertical, and on the same level with each other.
    Make sure that approximately 120 mm (4.72 in) of the foundation bolts is above the surface of the mast foundation.
  2. Make sure that the holes are free of dust, and clean and dry.
  3. Check the instructions of the chemical anchor manufacturer before use.
    The chemical anchor may harden very fast. Work in a coordinated manner and follow the instructions and the given working times.
  4. Fill the holes with chemical anchor.
  5. Place the foundation bolts in the holes, and turn the bolts to make sure the chemical anchor paste spreads evenly.

    Extra paste flows out from the holes.

  6. To push the foundation bolts all the way in, lightly tap the bolts with a hammer.
  7. Use the template and check that the mast foundation bolts are at the correct height, vertical, and on the same level with each other.
  8. Check the instructions of the chemical anchor manufacturer for the time it takes for the chemical anchor to set. Leave the chemical anchor to set.
1

Guy wire foundations have one foundation bolt each.