To help the assembly, the mast tubes in the delivery package are numbered. The marking is inside the mast tubes:
- Lowest mast tube is 1
- Middle mast tube is 2
- Highest mast tube is 3
To install the mast, follow this work order:
- Protecting with grease
- Assembling mast base on mast foundation
- Assembling mast
- Installing air terminal
- Installing sensors and other devices
- Routing cables
- 1
- Aluminum top section
- 2
- Mast tube 3
- 3
- Mast tube 2
- 4
- Mast tube 1
- 5
- Guy wire flanges
- 6
- Joining element, inside the mast tubes
- 7
- Mast base