To install the bolts, use the foundation
bolts (6 pcs) for the mast and guy wire foundations.
-
Check the correct position of the foundation bolt holes.
-
On the mast foundation, make sure that 120 mm (4.72 in) of the foundation bolts is
above the surface of the concrete foundation.
-
Use a spirit level to check the vertical position of the foundation bolts.
-
Make sure that the holes are free of dust, and clean and dry.
-
Check the instructions of the chemical anchor manufacturer before use.
| The chemical anchor may harden very
fast. Work in a coordinated manner and follow the instructions and the given working
times. |
-
Fill the holes with chemical anchor.
-
Place the foundation bolts in the holes, and turn the bolts to make sure the chemical
anchor paste spreads evenly.
Extra paste flows out from the
holes.
-
To push the foundation bolts all the way in, lightly tap the bolts with a hammer.
-
Use the template and check that the foundation bolts are at the correct height,
vertical, and on the same level with each other.
-
Check the instructions of the chemical anchor manufacturer for the time it takes for
the chemical anchor to set. Leave the chemical anchor to set.