Installation phases - OPT100

OPT100 Installation Guide

Document code
M211857EN
Revision
U
Language
English
Product
OPT100
Document type
User guide

Perform the installation of the DGA monitor in the following phases:

  • Planning

  • Mechanical installation

  • Electrical installation

  • Commissioning

  • Installation reporting

These phases correspond to chapters of the Installation Guide. Post-installation checklist is included as part of the installation report template.