Attaching foundation bolts to guy wire foundations - DKE110AV - DKE110F - DKE110W - DKF100-EXEL

DKF100-EXEL Installation Guide

Document code
M211818EN
Revision
D
Language
English
Product
DKE110AV
DKE110F
DKE110W
DKF100-EXEL
Document type
User guide
  • Steel wire
  • Electrical tape
  1. Place one foundation bolt to each foundation and tie the bolt with wire to the steel reinforcement bars.

    Tilt the foundation bolts approximately 45 … 60° towards the mast.

    Make sure that approximately 40 mm (1.57 in) of the foundation bolt is above the surface of the guy wire foundation.
  2. To protect the threads of the foundation bolts from concrete splashes, use electrical tape or similar.