Version information - DKE110F

DKE110F User Guide

Document code
M211788EN
Revision
E
Language
English (United States)
Product
DKE110F
Document type
User guide
Table 1. Document versions (English)
Document code Date Description

M211788EN-E

January 2022

An extra washer has been added to the guy wire flange.

The lifting rod has been updated.

Instructions for installing support arm have been added.

M211788EN-D

March 2019

Added information about using winch T‑handle.

Added tips for preventing corrosion and oxidation.

Modified instructions for placing mast and guy wire foundations.

Clarified DKE100TS location (inside the mast tube) in the delivery package.

Added instructions on protecting connectors with grease.

Adding instructions on maintaining painted surfaces, connectors, and screw joints.

M211788EN-C

June 2017

Added wind load reference calculation with wind speed of 50 m/s and one set of guy wires.

Updated foundation instructions.