|
In soft soil, you can install the screw pile foundations for the guy wires.
- Check the possible locations of water and gas lines, sewers, telecommunication cables, and electric cables.
-
Place the screw piles at a distance of 5 to 6 m (16 ft 5 in to 19 ft 8 in) according to
the length of the guy wires.
-
Assemble the screw piles. Tightening torque 250 Nm.
- 36
- Ground screw 1500 mm (59.06 in) (3 pcs)
- 37
- Lifting eyebolt DIN444 A M20×160 D20 (3 pcs)
- 38
- Hex screw DIN933 M20×90 (3 pcs)
- 39
- Washer DIN125 A21 (3 pcs)
- 40
- Hex nut DIN934 M20 (6 pcs)
- 41
- Plain washer ISO7094 ST 24 100 HV (3 pcs)
- 8
- Hex nut DIN934 M20 (3 pcs)
- 24
- Eye nut DIN582 M20 (3 pcs)