- Add 10 pieces of 5 AT spare fuses (delivered with the FSP102UGK kit) to the fuse kit (plastic bag) located inside the transmitter interface unit.
- Add 10 pieces of 5 AT spare fuses (delivered with the FSP102UGK kit) to the fuse kit (plastic bag) located inside the receiver interface unit.
-
Dispose of the old FSP101 units and old transformers.
Follow local laws and statutory regulations.