The following tools and materials are required but not supplied by Vaisala.

For new concrete foundations:

  • Bucket of water (1 to 2 pcs)
  • Cable conduit Ø 70 mm (2.76 in)
  • Cover such as tarpaulin
  • Hammer
  • Pen or marker
  • Saw
  • Shovel (1 to 2 pcs)
  • Spirit level
  • Stands for reinforcement structure
  • Steel reinforcement, 12‑mm (0.47 in) deformed steel
  • Steel wire
  • Tape
  • Wooden board for leveling, from 1.2 to 1.5 meters long (from 3 ft 11 in to 4 ft 11 in)
  • Wood for building the mold

For existing concrete foundations:

  • Adhesive tape
  • Brush and compressed air or air pump
  • Chemical anchor such as injectable adhesive anchor
  • Drill hammer
  • Hammer
  • Percussion drill
  • Spirit level

For planning and installation:

  • Set of wrenches
  • Set of Allen keys
  • Cable stripper
  • Cable ties
  • Compass
  • Crosshead and flat head screwdrivers
  • Hammer
  • Measuring tape
  • Spirit level
  • Torque wrench with adapters for hex bolts M12, M16, and M20
  • Wire cutters
  • Silicon grease
  • Non-conductive, non-water-soluble, non-silicon-based grease, such as ceramic or Teflon paste
Wear protective eyewear, gloves, safety helmet, and safety shoes.