  • Measuring tape
  • Spirit level
  • Wrenches
Wear protective eyewear, gloves, and a safety helmet.
Figure 1. Installing mast with solid base plate
1
Short pole mast
2
Foundation bolt
3
Nut, under and above the base plate
4
Spring washer, under and above the base plate
5
Washer, under and above the base plate
6
Concrete foundation
  1. Install the nuts to the foundation bolts.
  2. Place the spring washers and the washers on the nuts.
  3. Lift the base plate through the foundation bolts onto the washers.
  4. Install the nuts with the washers and spring washers to the foundation bolts.
  5. To level the mast vertically, adjust the nuts that are under the base plate with a wrench.
  6. Check with a spirit level that the mast is vertical. Check also that the distance between the concrete foundation and the base plate is more than 30 mm (1.2 in).
  7. Tighten the bolts.