To assemble the mast, follow this work order:
-
See the relevant mast installation instructions:
- Assembling mast tubes
- Connecting guy wire set to mast
- Installing sensors and other devices
- Installing air terminal
- Routing cables
- Connecting guy wires to concrete blocks