Drilling holes for foundation bolts - DKP206AV - DKP206W - DKP210AV - DKP210W

DKP206 and DKP210 User Guide

Document code
M210315EN
Revision
F
Language
English
Product
DKP206AV
DKP206W
DKP210AV
DKP210W
Document type
User guide
  • Adhesive tape
  • Brush and compressed air or air pump
  • Chemical anchor such as injectable adhesive anchor
  • Drill hammer
  • Hammer
  • Measuring tape
  • Spirit level

To drill the holes to the mast foundation, use the template (1 pc) for positioning the foundation bolts.

You can use existing concrete blocks as foundations for the mast and the guy wires.

  1. Start with the mast foundation. Mark the drilling depth on the drill bit with tape: 24 cm (9.45 in) (with a tolerance of 5 mm / 0.20 in).

    The hole diameter is 25 mm (0.98 in).

  2. Place the template on the concrete foundation. Check the correct position and orientation of the template depending on your location.
  3. To make sure the template does not move, hold the template in place with your feet.
  4. Aim the drill bit through one of the holes in the template and drill a hole that is a couple of centimeters deep.
  5. To avoid getting the drill bit stuck in the hole, lift the drill bit every once in a while when drilling to remove excess dust.
  6. When the first hole is ready, place a foundation bolt in the hole through the template. This bolt locks one corner of the template in place.
  7. Drill a second hole, and place a foundation bolt in the hole through the template.
  8. Repeat for the third hole.
  9. Drill the fourth hole, and remove the template.
  10. Clean dust from the holes with a brush and compressed air or an air pump.
  11. Continue drilling the holes until you reach the tape mark in the drill bit. Clean dust from the holes using a brush and compressed air or an air pump.
  12. To check that the holes are of the same depth, put the mast foundation bolts into the holes. Use a spirit level to make sure the bolts are level.
    Make sure that approximately 80 mm (3.15 in) of the foundation bolts is above the surface of the mast foundation.
  13. For the guy wire foundations, drill one hole to each foundation.

    Tilt the foundation bolts approximately 45 … 60° towards the mast.

    Make sure that approximately 40 mm (1.57 in) of the foundation bolt is above the surface of the guy wire foundation.
  14. Clean dust from the holes with a brush and compressed air or an air pump.